Name: Chengdu Chuangding Mechanical Equipment Co.,Ltd Telephone: 028-84823534 Fax:028-84823534 Contact person: guojianquan (Chairman) Phone:13908004846 Website: http://www.cdcdjxsb.com Address:chengdushi longyuanyiqu shanquanzhenlianhecun liuzu
|
|
|
|
|
|
|
Your present position: home >> News |
|
Attention items for installation and maintenance of light brick equipment |
|
Update time:2015-09-15 18:21:13 点击数:1772 |
Light brick equipment installation and maintenance of attention, in order to allow investors to put into operation as soon as possible gains: A, to avoid a collision, collision, civilized assembly, pay attention to the protection of the mold. Two, the daily cleaning of the mold, the use of air compressor, soft tool to remove the concrete residue, it is strictly prohibited to gravity, pry the mold. Third, replaced the mold, clean, oiled to prevent rust should buy is dry, flat at branch level up, to prevent deformation of the gravity. Four, the installation and commissioning of light brick equipment is very important, the factory is made in accordance with the relevant provisions of the factory test, but due to the long distance transportation and longer time, etc., light brick equipment should be installed. Five, light brick equipment to carry out a comprehensive paint on the work, before the test machine to the relative sliding of the moving parts of the site according to the provisions of gas lubrication. If due to transport need to take apart the machine can be divided into type device, send plate device, feeding device, block device, stacking device, phase electric control device and installation to according to the relationship between assembly in place. The above five points is now made up for you to bring about light brick equipment maintenance work, I hope to help you! Thank you very much for reading, if you are in need of brick making machine, please come to our company to purchase, we will serve wholeheartedly for you.
|
|
|
|
Print this page | Close window |
|
|